Staff

Thursday, February 16, 2012

Tree Replacement

During the course of the season, the Austrian Pines behind the 12th green showed symptoms of declining health.  Many factors could be attributed to these symptoms (disease, extreme heat, chemical exposure) but the simple fact of the matter is that they had to be removed.  The Austrians protected the 13th tee from errant shots at the 12th green, so new, large trees are needed to replace them. 
Winter usually provides ideal conditions for tree transplant and replacement.  The equipment that removes and carries these 20 feet trees weighs over 25 tons.  Considering the root ball itself can weigh 5 tons, a superintendent has to be either extremely brave to let this type of equipment out during the season, or wait for winter.  The ground is usually frozen solid to a depth of a 5-6 inches by this time of year and will support the heavy tree-spade and root ball without leaving deep ruts around the course.   Transferring during the dormant season (winter) means that the tree has little need for water and when that need arises, plenty will be available due to snow melt. 
Unfortunately, the winter of 2012 has been very unpredictable.  With constant thaws the ground has not been able to freeze completely.  To make sure that as little damage is done as possible, the crew worked in the cold hours of the morning and placed large plywood sheets around highly visible and crucial areas of the golf course (the 13th tee and its surrounds), to enable the tree service to cut holes and place the 4 new white pines and 1 new river birch in the selected areas.  The white pines will provide adequate protection to the 13th tee and are impressive specimens, with the potential to grow over 60 feet tall.  Planting during the winter season also allowed the crew to not worry about disrupting golfers, an easy thing to do when transplanting 25 foot trees.



The slide show documents the process of placing these new trees.    




Thursday, December 15, 2011

Northville Historical Society; A Tribute to Meadowbrook Country Club


Founded in 1916, Meadowbrook Country Club is one of the oldest clubs in the Detroit area.  Originally it consisted of just 6 greens and 125 acres.  Now, with over 180 acres and remodels done by storied architects such as Donald Ross, MCC remains one of  Detroit's elite clubs.
It's hosted a number of PGA Championships and other tournaments including the Motor City Open.  Prominent names such as Byron Nelson, Bob Hamilton, Ben Hogan and Cary Middlecoff have tee'ed off here.  Nelson and Hamilton hold the 18 hole record, posting scores of 63 in 1946 and 1949 respectively.  More than a decade later, Mike Souchek shot a 63 during the second round of the Motor City Open in 1959. 
Andrew Bertoni, superintendent at MCC from 1952-1968, recovered a scrapbrook pieced together from old newspaper articles and PGA literature that highlights the clubs rich history.  The following is an article from that source.  It was written by William H. Ashton, who served as the club historian and Green Chairman.

Wednesday, November 30, 2011

Winter Preparation

As Michigan gears up for winter, golf course superintendents are doing the same.  An important aspect of turf management is preparing the grass for the extreme climate changes of winter (freeze/thaw cycles and heavy snow fall).  There are many different tasks that are part of winterizing a course and the major ones that da' Brook performs are explained in the following article.

Dormant Feeding:
Dormant feeding is an important element in this preparation.  It entails a heavy rate of solid fertilizer applied to specific areas of the course.  MCC applies a granular fertilizer to its tees and fairways at a rate of 350lbs of product per acre.  The fertilizer formulations for dormant feeding usually include a small amount of nitrogen coupled with a large amount of potash (Potassium).  Potassium is an important plant nutrient at this time of year because it provides strength to cell walls.  Long periods of cold temperatures or abrupt freezes and thaws are extremely detrimental to the turf.  Ice crystals, formed by cold temperatures can puncture cell walls in a weakened condition.  During a thaw, the plant can actively take up water, hydrating the turf.  The water will than freeze puncturing cell membranes from the inside, which will result in the death of the cell.  This process in known as crown hydration, and while not completely unavoidable, dormant feeding does provide some relief from it. 
The summer of 2011 left its mark on some of the fairways, in the form of voids or bare spots in the turf.  The crew hopes that the dormant feed will assist in the recovery of these spots before the snowfall and carry the benefits into the spring.

Snow Mold Control:
The biggest threat to turfgrass during the winter from a disease standpoint are the snow molds; Pink and Gray.  Pink snow-mold is the most common in Michigan (Gray requires a long, heavy snow-cover that southeastern Michigan does not see consistently) and before the snow comes, superintendents try to spray the vital areas of the course with fungicides.  The norm for snow mold prevention and control has become a combination of products that contain active ingredients from different chemical families.  On a side note, PCNB, a very effective fungicide for snow mold applications was taken off the market to edit it's EPA Label.  It recently has re-entered the market and superintendents are thankful for its return. 

Winterizing the Irrigation System:
To avoid pipe and sprinkler head damage brought on by water expansion during freezing, the irrigation system of golf courses are winterized in late fall.  This entails the shut down of the pump house and the use of a large air compressor to blow the remaining water out of the lines.  The irrigation lines themselves contain thousands of gallons of water but with the use of the large compressor and experience of the first assistant and irrigation tech, the task can be completed in a day.  This is also an excellent time to check sprinkler heads for malfunctions (with thousands of yards of pipes, wire and numerous sprinkler heads it stands to reason that something might go unnoticed). 

Winter Covers/Green Winter Preparation:
Meadowbrook CC is in the process of trying a new management practice in regards to prepping the greens for winter.  Instead of aerifying the greens in early fall, the crew waited until mid-November.  The greens were topdressed heavily with over a quarter inch of sand than aerified, leaving a large amount of sand on the greens surface.  The theory is that the surface sand will provide some insulation/protection to the green during the winter months and the aerification holes will aid in removing water from the greens surface, which can damage turf when it freezes. 
Due to the orientation of some greens, more protection is needed.  Greens that are exposed to northern winds or heavy snowfall are covered with bubble wraps and heavy tarps.  The bubble wraps are similar to the packing material and allow for air exchange between the green surface and atmosphere (to prevent the build up of toxic gases).  The heavy tarps are placed on top of the bubble wrap and protect the green from winds, snowfall and surface water.  The combination of these two is an effective mechanical practice in preventing winter damage. 


Everything the crew does at this time of year is geared towards having a healthy golf course come spring.  Hitting the ground running in late March and April is a huge advantage when the golf season starts.  We hope the members have a pleasant winter and happy holidays.  Enjoy.

Tuesday, November 1, 2011

Deep Tining

This soil profile taken from a MCC green shows the distinct topdressing and native soil layer.  As you can see the topdressing sand stops at about 4" down.  Traditional aeration machines cannot reach below this depth and to acheive better drainage into the native soil layer, deep tining is used. 

Deep tining requires a special set of tines and machine that most grounds crew do not have in their arsenal.  So here at MCC, the task is contracted out.  With a contractors specialized aeration set they can alleviate compaction issues and penetrate soil layers that regular aeration methods will not achieve.  Tining into the native soil will allow for better surface drainage which translates into firmer and faster greens, even after periods of rain.  It is an important cultural practice, specifically for native soil greens that do not have the USGA recommended sand layer of 12 inches (most older courses do not have this recommendation due to the fact they were built before the recommendations were released).

The process is similar in all aspects to a regular aeration/topdressing application.  The greens are deep-tined following a heavy application of topdressing sand.  The sand is than worked into the holes using turbine blowers and a specialized brush attached to a golf cart.  The goal is to fill all the holes to brim, creating channels for more effecient drainage.  The contractor can complete about 12 holes a day so the entire process will only take a day and a half.  We hope to see a benefit in the form of playable greens after heavy rains, which is key in the spring when members are itching to play and mother nature is ready to dump large amounts of precipitation (the spring of 2011 was one of the wettest on record).

Topdresser and Deep-Tine Tractor in action

Friday, October 28, 2011

Drainage Project on 14th Green

The few members that braved the colder temperatures this week had to deal with a temporary green on the 14th hole.  The green itself is in the process of having drainage lines installed.  The installation of these tiles will be a benefit in regards to playability and maintenance. 

The right side of the green has a slight depression that collects water after most rain events, making cup placement around the area difficult.  Members may have noticed that the approach to the green also collects water, making the area unplayable.  With the completion of these drainage tiles, members will enjoy a better playing surface after rain events.  The staff will appreciate the construction as well.  Standing water makes maintenance practices impossible, not to mention that disease pressure skyrockets during the summer months when an area of turf is completely saturated for extended periods of time.
The diagram above shows the general design and layout of the tiles.  Installation of a tile requires hard work and steady hands.  The sod is removed, the trench cut with a Ditch Witch and the spoils have to be hauled off-site.  Than the tile itself (2"drainage pipe) has to be laid and the trench back-filled with a special blend of soils.  The mix consists of 60% sand (for infiltration and firmness), 20% peat and 20% soil (for its water and nutrient holding capacity).  The mix has to be tamped down to ensure that the tile lines do not settle beneath the existing green surface.  Finally, using a masons trowel to smooth and level the soil at the top of the trench,the sod is replaced and tamped extensively to ensure a true putting surface. 

Over 1200 linear feet of tile will eventually be laid, requiring over 30 tons of mix to re-fill the trenches.  Any construction on a green requires a knowledgeable and attentive crew, so hat's off to the members of the staff participating in the project.  As always, we appreciate the members patience and we hope to have the green open soon.  Enjoy. 

Slide show of 14th Green Drainage Project



Tuesday, October 11, 2011

Fairway Topdressing

The fairways here at MCC consist namely of native soils (silt and clay for southeastern Michigan).  While this soil has greater water and nutrient holding capacity, they drain very poorly.  Because of advancements in irrigation and fertilization the focus on soil types is more geared towards drainage.  That's why certain fairways (3,4,14,17) are sand topdressed, the soil consistency needs to be altered. 
The practice of sand topdressing these fairways benefits both golfers and maintenance staff members.  As more sand accumulates, fairways become firmer and drier.  These two traits lead to less traffic restrictions (i.e. carts and equipment).  Drier fairways are also less prone to disease, such as brown patch and pythium.  These two fungal diseases require moist conditions to become active, which is less likely to occur in sand based soils. 
The cost of fairway topdressing varies based on the type of sand, equipment and labor hours.  It is definetly not cheap.  However, an arguement can be made that the price of topdressing is offset by a decline in the need for chemicals (fungicides) and an increase in cart fee's and overall rounds played (less restrictions on carts and course closings). 
Large precipitation events will always be a nightmare for general managers and superintendents, there will always be course closings.  But a fairway topdressing program could significantly decrease the longevity of a heavy rains negative effects.  Potentially, carts and large equipment could be out mere hours after a large storm with little danger of damaging the turf or sacrificing playbility.  The crew will be topdressing the previous mentioned fairways over the next couple of days, taking advantage of the nice weather.  For a more in-depth look at fairway topdressing / aerification, read this article by Stanley J. Zontek of the USGA:

Wednesday, October 5, 2011

Fairway Aerification

     Football is in full swing, the tree's are turning and golf course superintendents are hoping to aerify their fairways.  If possible, fall aerficiation is very beneficial in regards to alleviating compaction and removing/diluting thatch that has built up over the season. 
     Fall aerification is difficult to plan, the major factor being precipitation.  If the region hasn't seen any precipitation than the turfgrass roots will not be sufficient to hold the turf in place, resulting in lifting of the turf or general damage to the fairway.  If the soil is too moist (heavy rain events) than aerifying will result in a mud-bowl that would cause more harm than good.  The key is having your equipment and crew prepared for when that opportune time comes.
     For the duration of the week (Oct 3rd-7th) the crew will try to aerify as many fairways as possible.  Some, due to soil type and elevation changes, are difficult to aerify but the majority will be cored, processed, and cleaned.  This will pay huge dividends late into the season and coming out of winter.  We hope that members will be patient throughout this process and know that the crew will complete the job as efficiently as possible. 
16th Fairway